A CBG plant is sold in tonnes per day. Compressors are sold in SCMH and bar. Somewhere between the project report and the purchase order, someone has to turn one into the other, and that is where a lot of plants get the compressors wrong.

This post walks through that conversion. It covers how much raw biogas a tonne of CBG needs, which compressors a typical plant uses and at what pressure, and how to size each one. We use Colt's BG series as the reference throughout, but the method works for any make.

The three compression duties in a CBG plant

Gas gets compressed at three points between the digester and the cascade, and each point has a different flow and pressure.

  • Raw biogas boosting: Gas leaves the digester or gas holder at very low pressure, often just a few millibar. A booster lifts it so it can pass through pre-treatment and reach the upgrading unit. Colt's BG-L series is a screw compressor for this job, 0 to 10 bar, 200 to 2,100 SCMH.
  • Upgrading feed: PSA and membrane units each need gas at a set inlet pressure, decided by the upgrading supplier. Colt's BG-M series is a screw or booster package for 0 to 40 bar, 200 to 2,100 SCMH.
  • CBG compression: Upgraded gas is compressed to 200 to 250 bar for cylinder filling and cascades. This is reciprocating territory. Colt's BG-H series covers 200 to 250 bar, 100 to 400 SCMH per machine.

The flow drops sharply between the first and last stage, because upgrading removes most of the CO₂. So the booster at the front handles far more gas than the CBG compressor at the end. Sizing all three from one number is a common mistake.

Step 1: Convert tonnes per day into CBG flow

CBG is mostly methane. At standard conditions, a cubic metre of it weighs roughly 0.7 kg. That gives a simple working figure:

1 TPD of CBG = 1,000 kg ÷ 0.7 kg/Sm³ ≈ 1,430 Sm³ a day, or about 60 SCMH over 24 hours.

That 60 SCMH per TPD is the flow your CBG compressor has to handle, if the plant runs round the clock.

Step 2: Work back to raw biogas

Raw biogas from a digester is usually 55 to 60 percent methane. CBG has to be at least 90 percent methane under IS 16087, and most plants upgrade to somewhere above that. Upgrading also loses a little methane along the way.

Put those together and you need roughly 100 SCMH of raw biogas for every tonne of CBG a day. That is about 2,400 Sm³ of raw biogas per tonne. Treat it as a planning figure. Your actual number depends on methane content, upgrading recovery and how many hours the plant really runs, so check it against the developer's mass balance.

CBG outputRaw biogas (approx.)Upgraded CBG flow (approx.)
1 TPD100 SCMH60 SCMH
2 TPD200 SCMH120 SCMH
5 TPD500 SCMH300 SCMH
10 TPD1,000 SCMH600 SCMH
20 TPD2,000 SCMH1,200 SCMH

Step 3: Size each compressor

  • Raw biogas booster: Size on the raw biogas flow, plus a margin of 10 to 15 percent for gas production swings. A 5 TPD plant needs a booster around 550 to 575 SCMH.
  • Upgrading feed compressor: Size on the flow and pressure the upgrading supplier specifies. Ask them for both figures in writing before you finalise the compressor, because inlet pressure varies widely between PSA and membrane designs.
  • CBG compressor: Size on the upgraded flow. A 5 TPD plant needs about 300 SCMH, which one BG-H machine can cover. A 10 TPD plant needs about 600 SCMH, which means two machines.

For a plant that cannot stop, two CBG compressors are worth more than one bigger one. If one is down for service, the plant keeps filling cylinders at half rate instead of flaring gas.

A worked example: 5 TPD plant

  1. CBG flow: 5 × 60 = 300 SCMH.
  2. Raw biogas: 5 × 100 = 500 SCMH, plus 15 percent margin, about 575 SCMH.
  3. Booster: one BG-L unit sized for about 575 SCMH at the pressure your pre-treatment and upgrading need.
  4. Upgrading feed: a BG-M unit at the upgrading supplier's stated inlet pressure, if the booster alone cannot reach it.
  5. CBG compression: about 300 SCMH at 250 bar, which fits within one BG-H unit, or two smaller units for redundancy.

Your figures will move once real gas analysis and running hours are known. The method stays the same.

Biogas is not air. Plan for what is in it

Raw biogas carries hydrogen sulphide, moisture and sometimes siloxanes. H₂S corrodes metal and contaminates oil. Water condenses in pipes and cylinders. Skipping pre-treatment shortens the life of every compressor downstream.

  • Remove H₂S before compression wherever possible
  • Dry the gas and drain condensate at each stage
  • Choose materials and lubricants suited to biogas
  • Treat the compressor area as a hazardous area for flammable gas, and select electrical equipment to match
  • Fit gas detection and keep relief devices tested

Questions to settle before you order

  • What is the daily CBG target, and how many hours a day will the plant actually run?
  • What methane content does the digester produce, measured, not assumed?
  • What inlet pressure does the upgrading unit need?
  • Cylinder filling, cascades, or both?
  • How much redundancy can the business afford, and how much downtime can it afford?
  • Who services the compressors, and how fast?

About Colt's BG series

Colt builds biogas compressors at its Sonipat plant: the BG-L screw booster, the BG-M screw or booster for upgrading feed, and the BG-H reciprocating compressor for 200 to 250 bar CBG. Packages are pre-tested, have PLC control and a low-vibration design, and need no special foundation. Colt's wider reciprocating gas range uses horizontal balanced opposed designs in broad accordance with API 618. Service, AMC and spares are handled through Colt's Pan-India network.

The short version

Work in this order: tonnes per day to CBG flow, CBG flow back to raw biogas, then size the booster, the upgrading feed and the CBG compressor separately. Use about 60 SCMH of CBG and 100 SCMH of raw biogas per TPD as a starting point, and replace those with your own mass balance as soon as you have it.

Send your TPD target, gas analysis and upgrading technology, and get in touch with Colt Group. Colt's team will size the compressors for the whole chain.

Frequently Asked Questions

Roughly 100 SCMH, or about 2,400 Sm³ a day, with raw biogas at 55 to 60 percent methane. Confirm it against your plant's mass balance.

About 60 SCMH over 24 hours, using roughly 0.7 kg per standard cubic metre.

Cylinder filling and cascades typically run at 200 to 250 bar.

No. Raw biogas boosting, upgrading feed and CBG compression run at very different flows and pressures, so they are normally separate machines.

Upgrading removes most of the CO₂, so the gas volume after upgrading is about 60 percent of the raw biogas volume.

Two smaller machines keep the plant running at part capacity during maintenance, which usually makes them the better choice for continuous plants.

100 to 400 SCMH per machine, at 200 to 250 bar.